In the plaza General Osorio at the eastern end of Ipanema, they are finally opening the next subway station. It take about 3 years for each extension of the system but they are promising that they would have the subway system all the way down to the Barra as part of the plan offered to the Olympic committee in order to win the 2016 games,
I had heard that they finally opened our station even though there still seems to be some final details to be worked out. I braved a heavy homecoming downpour to take photos for you.
The above ground entrance is done, and the tracks going into central - downtown Rio are working. I walked all the way down to see how the new station looks.
The actual track seem to be about 5 stories below ground. A series of escaladors and moving walkways take you down and down and down again to the ticket sales, then there is one more level of stairs down to track side. It was possible
to look up-track to were they are already
working on the next section.